Goals with target hours.
Give each goal a number of hours for a defined period, fit those hours around your commitments, then compare the target with time logged. If you have 12 hours available this week, you might assign 4 to a project, 3 to learning, 3 to family and 2 to reading.
Start on the webAlso available on iPhone and Android.

Why give a goal target hours?
“Learn Spanish” names an intention but leaves its place in the week undecided. “Practise Spanish for 3 hours this week” gives you an allocation you can place in actual gaps and check later.
Hours measure the time you give an activity, not the result it guarantees. Pair the allocation with a concrete next task, such as completing one lesson, and review the output separately from the hours spent.
Start with your weekly time budget: reserve sleep, work, meals, care, travel and open time before dividing what remains among goals. Count an hour once even if two activities happen together.
Choose target hours: a 12-hour week across 4 goals
This fictional ordinary week has 168 hours. Existing commitments take 148 and 8 stay open for overruns or later choices, leaving 168 − 148 − 8 = 12 hours for four chosen goals; these are illustrative allocations, not recommended amounts.
| Goal | Weekly target (h) | Blocks to place |
|---|---|---|
| Personal project | 4 | Two 2-hour blocks |
| Spanish learning | 3 | Three 1-hour blocks |
| Family time | 3 | Two 1.5-hour blocks |
| Reading | 2 | Four 0.5-hour blocks |
| Total | 12 | All four goals fit the available hours |
The targets add to 4 + 3 + 3 + 2 = 12, and the whole week balances at 148 + 8 + 12 = 168. If a new commitment needs two hours, reduce or move two hours already allocated before adding it.
Name the period and the next task
Write “this week” beside the target and choose something specific for its first block, such as outlining the project introduction. Use recent entries to estimate how much time the task can use.
Check the gaps before choosing the number
Place the project’s two blocks on Tuesday and Saturday only if both days have two hours available. Lower the target if the actual gaps cannot hold it, or explicitly move another optional activity.
Translate the weekly target into daily blocks
A 3-hour learning target can use Monday, Wednesday and Friday for one hour each, leaving the other days without a learning block. Set each day’s hour goal from that day’s available time instead of dividing every weekly target by seven.
Review target hours against logged hours
At the end of the week, total entries under the same four goal names and calculate gap = logged hours − target hours. A negative gap means the goal received less time; a positive gap means it received more.
| Goal | Target (h) | Logged (h) | Gap (h) |
|---|---|---|---|
| Personal project | 4 | 3 | −1 |
| Spanish learning | 3 | 2.5 | −0.5 |
| Family time | 3 | 4 | +1 |
| Reading | 2 | 1.5 | −0.5 |
| Total | 12 | 11 | −1 |
The logged total is 3 + 2.5 + 4 + 1.5 = 11 hours, one below the combined target. Check the record for the remaining hour before assigning it to another activity; if it was not recorded, keep it unaccounted for.
- Check the missed or extended blocks and any notes before changing a target.
- Decide whether the difference came from a deliberate choice, a new commitment or an estimate that needs revision.
- For the next week, choose one change and check that the revised hours still fit.
If four hours of family time now reflects your choice, one possible next allocation is project 3, learning 3, family 4 and reading 2: still 12 hours. If you want to keep the project at four, find its extra hour elsewhere in the budget before restoring that target.
Set and compare goals with target hours in Daylight
Add goals and activities with a color and target hours, then place blocks across all 24 hours of your day. Blocks run from 15 minutes to 8 hours in 15-minute steps, so a half-hour reading allocation fits as one block.
Daylight logs the time you enter against a goal, with an optional note; you can edit or delete entries. It puts planned hours beside logged hours so you can compare the allocation with what happened.
History compares this week with last week and the last 30 days with the 30 before. Use those period comparisons alongside the target review to decide what to allocate next.
Daylight Pro is $4.99 a month or $39.99 a year, plus applicable sales tax, with a 14-day free trial. There is no free plan: a valid payment method is required, and charging starts after the trial unless you cancel.
Sources
Read November 18, 2026. The allocations and review method are original worked illustrations; no population statistics are used.
- Daylight home page — goals, target hours, block sizes, entered time, plan comparisons, History and subscription terms.
- Daylight how to stop wasting time guide — guide structure and trial price line.