Daylight guide

Ideal week template.

An ideal week is a realistic plan for where you want your hours to go. Reserve fixed commitments, give chosen goals specific blocks, leave room for changes and compare the result with the time you log. Use the worked week below as a starting allocation, then adapt it to your own days.

Start on the web

Also available on iPhone and Android.

Daylight History comparing logged hours with the previous period
Daylight’s real History screen. Example data.

What an ideal week includes

The template describes a week you could actually live: work, sleep, meals, care, travel, personal goals and unallocated time all have a place. It is a draft to revise when commitments change, rather than a promise that every day will match.

Start with seven ordinary 24-hour days, giving 168 hours in total. Count each hour once, including when activities happen together; for a week with a clock change, use the hours actually available.

Build your ideal week in 4 steps

  1. Reserve the fixed parts first

    Write down work shifts, appointments, travel, sleep, meals and care for each day. Use your recent week to estimate their duration; a necessary commitment takes space even when you would prefer a different allocation.

  2. Choose goals that fit the remaining hours

    Subtract those essentials before adding projects or learning. In the example, sleep, work, meals and care, and travel use 125 hours, leaving 43 for a project, learning and open time. Reduce a target if the remainder cannot hold it.

  3. Place goals in named blocks

    Give each chosen activity a start and end time around the fixed parts. The sample project gets 7:00–8:00 PM on each weekday and 10:00 AM–noon on each day off: five one-hour blocks plus two two-hour blocks make nine hours.

    For complete daily schedules, use the time blocking template guide to turn the allocations into a sequence of blocks.

  4. Keep open time and book a review

    Leave space for overruns and decisions you cannot make yet. Put a 15-minute review inside an existing work or open-time allocation, then check that every day's total fits before the week begins.

A worked ideal week: 168 hours

This fictional template has five workdays, Monday to Friday, and two days off, Saturday and Sunday. The first two number columns show hours per day; the final column multiplies them by five and two respectively. These are example allocations, not recommendations about how much time any activity needs.

AreaWorkday (h)Day off (h)Week (h)
Sleep8856
Work8040
Meals / care3423
Travel10.56
Project129
Learning0.514.5
Open time2.58.529.5
Total2424168

Meals and care includes household chores; open time includes chosen leisure and space for changes. The workday adds to 8 + 8 + 3 + 1 + 1 + 0.5 + 2.5 = 24, and the day off to 8 + 0 + 4 + 0.5 + 2 + 1 + 8.5 = 24.

Shift the day-off columns to match your working pattern. If Tuesday needs two extra hours of care, move or reduce another Tuesday allocation by the same amount; an unused Saturday block cannot make Tuesday longer.

Compare the ideal with the real week

Log time using the same areas as your plan, then calculate gap = logged hours − planned hours. A positive gap means an area received more time; a negative gap means it received less. Keep unrecorded hours separate until you can account for them.

Suppose the sample project receives six logged hours instead of nine, while work takes 42 hours instead of 40 and travel takes seven instead of six. Those gaps are −3, +2 and +1 hours; with every other row unchanged, the logged week still totals 168.

Check which project blocks moved and why before changing the next plan. If the extra work and travel will continue, either make six project hours the realistic target or move three hours from open time: 29.5 becomes 26.5, restoring the nine-hour project allocation without increasing the total.

  • Which planned blocks happened at the intended time?
  • Which differences came from necessary commitments or deliberate choices?
  • Which estimates were too short, and where can the extra hours fit?
  • What single change will you make before the next review?

For the category totals behind your schedule, continue with the time budget guide.

Plan the week and compare entered time in Daylight

Create goals with colors and target hours, then place their blocks across each day's full 24 hours. Blocks run from 15 minutes to 8 hours in 15-minute steps, so you can build the week around the commitments you have already reserved.

Daylight puts planned hours beside logged hours. It logs the time you enter against a goal, with an optional note; edit entries if your record needs correcting.

History compares this week with last week and the last 30 days with the 30 before. Use those period comparisons alongside your ideal-week review to decide which blocks or targets to change.

Daylight Pro is $4.99 a month or $39.99 a year, plus applicable sales tax, with a 14-day free trial. There is no free plan: a valid payment method is required, and charging starts after the trial unless you cancel.

Sources

Read November 18, 2026. The four steps and worked hours are original illustrations, with no research-based performance claims.